Bullheading is one of the well control methods that involve pumping formation fluids back into formation into a shut-in well.


Components of Pumping Pressure

For the bullheading operation, pumping pressure on surface is equal to summation of all frictional pressure and formation pressure minus hydrostatic pressure (Figure 1). The equation below shows this relationship in a mathematical term.

Pump Pressure = Friction Pressure of Surface Lines + Friction Pressure of Tubing + Friction Pressure Across Perforations + Formation Pressure – Hydrostatic Pressure of Tubing
The pump pressure concept will be utilized for the bull heading calculation.


                                    Figure 1 – Pump Pressure Components




The well information is given below;


Production casing was set at 12,000’MD/12,000’TVD.

Bottom of perforation is at 11,500’MD/11,500’TVD.

Bottom of perforation is at 11,000’MD/11,000’TVD.

End of production tubing is at 11,500’MD/11,500’TVD.

Production packer is at 10,300’MD/10,300’TVD.

Formation fracture gradient is 0.645 psi/ft

Formation pressure gradient is 0.445 psi/ft

Shut in tubing pressure = 2,800 psi

Production casing: 7” OD, 29 ppf, L-80, capacity factor = 0.0371 bbl/ft

Production tubing: 3.5” OD, 9.2ppf, L-80, capacity factor = 0.0087 bbl/ft

Pump output (bbl/stk) = 0.1 bbl/stk

Figure 2 describes the wellbore diagram based on the given information.


                                         Figure 2 – Diagram of the well




Calculations

For the bull heading calculation, reference points for calculation formation pressure, fracture pressure, kill weight mud are based on top of perforation because it gives the most conservative fracture pressure value.


Formation Pressure (psi) = Pressure Gradient (psi/ft) x Top of Perforation TVD (ft)

Formation Pressure (psi) = 0.445 x 11,000 = 4,895 psi 


Fracture Pressure (psi) = Fracture Gradient (psi/ft) x Top of Perforation TVD (ft)

Fracture Pressure (psi) = 0.645 x 11,000 = 7,095 psi


Initial Hydrostatic Pressure (psi) = Formation Pressure (psi) – Shut In Tubing Head Pressure (psi)

Initial Hydrostatic Pressure (psi) = 4,895 – 2,800 = 2,095 psi


Initial Average Fluid Density (ppg) = Initial Hydrostatic Pressure (psi) ÷ (0.052 x Top of Perforation TVD (ft))

Initial Average Fluid Density (ppg) = 2,095 ÷ (0.052 x 11,000) = 3.66 ppg


Kill Weight Mud (ppg) = Initial Average Fluid Density + (Shut In Tubing Pressure (psi) ÷ 0.052 ÷ Top of Perforation TVD (ft))

Kill Weight Mud (ppg) = 3.66 + (2800÷ 0.052 ÷11,000) = 8.6 ppg


Maximum Initial Surface Pressure (psi) = Formation Fracture Pressure (psi) –Initial Hydrostatic Pressure (psi)

Maximum Initial Surface Pressure (psi) = 7,095 – 2,095 = 5,000 psi


The below calculation relates to pressure while bullheading.



Maximum End of Tubing Pressure (psi) = Fracture Pressure (psi) – (Kill Weight Mud (ppg) x 0.052 x End of Tubing TVD (ft)) – Initial Average Fluid Density (ppg) x 0.052 x (Top of Perforation TVD (ft) – End of Tubing TVD (ft))

Maximum End of Tubing Pressure (psi) = 7,095 – (8.6 x 0.052 x 10,500) – (3.66 x 0.052 x (11,000 – 10,500)) = 2,304 psi


Maximum pressure when Kill Mud Weight reaches perforation

@ Top of Perforation (11,000 ft TVD)

Maximum Final Pressure (psi) = Formation Fracture Pressure @ top of perforation (psi) – (Kill Weight Mud (ppg) x 0.052 x Top of Perforation TVD (ft))

Maximum Final Pressure (psi) = 0.645 x 11,000 – (8.6 x 0.052 x 11,000)
Maximum Final Pressure (psi) = 2,176 psi

@ Bottom of Perforation (11,500 ft TVD)

Maximum Final Pressure (psi) = Formation Fracture Pressure @ bottom of perforation (psi) – (Kill Weight Mud (ppg) x 0.052 x Bottom of Perforation TVD (ft))

Maximum Final Pressure (psi) = 0.645 x 11,500 – (8.6 x 0.052 x 11,500)
Maximum Final Pressure (psi) = 2,275 psi
The most conservative figure for the maximum final pressure is 2,176 psi.
As you can see, the figure reference to the top of perforation gives the most conservative figure. This is the reason why top of perforation is selected for the calculation.


Volume Pumped in Tubing (bbl) = Tubing Capacity Factor (bbl/ft) x Length of Tubing (ft)

Volume Pumped in Tubing (bbl) = 0.0087 x 10,500 = 91.4 bbl


Stroke Pumped in Tubing (stk) = Volume Pumped in Tubing (bbl) ÷ Pump Output (bbl/strk)

Volume Pumped in Tubing (stk) = 91.4 ÷ 0.1 = 914 strokes


Volume Pumped From End of Tubing to Top of Perforation (bbl) = Casing Capacity Factor (bbl/ft) x (Top of Perforation TVD (ft) –End of Tubing TVD (ft))

Volume Pumped in Tubing (bbl) = 0.0317 x (11,000 – 10,500) = 18.6 bbl


Stroke Pumped From End of Tubing to Top of Perforation (stk) = Volume Pumped in Casing (bbl) ÷ Pump Output (bbl/strk)

Volume Pumped in Tubing (stk) = 18.6 ÷ 0.1 = 186 strokes


Volume Pumped From Top of Perforation to End of Perforation (bbl) = Casing Capacity Factor (bbl/ft) x (End of Perforation TVD (ft) – Top of Perforation TVD (ft))

Volume Pumped in Tubing (bbl) = 0.0317 x (11,500 – 11,000) = 18.6 bbl


Stroke Pumped From Top of Perforation to End of Perforation (bbl)) = Volume Pumped in Casing (bbl) ÷ Pump Output (bbl/strk)

Volume Pumped in Tubing (stk) = 18.6 ÷ 0.1 = 186 strokes


Total Volume Pumped Summary






In order to push all formation fluid back to formation, it is required that the pumping volume must be at least volume from surface to end of perforation.


Pressure Schedule While Bull Heading

This is the same concept as pressure schedule in wait and weight well control method.


Pressure Decreasing in Tubing (psi/required stks) = (Maximum Initial Surface Pressure (psi) – Maximum End of Tubing Pressure (psi)) X Required strokes (stks) ÷ Tubing volume (stk)

For this calculation, 100-strokes is selected.
Pressure Decreasing in Tubing (psi/required stks) = (5,000 – 2,304) x 100 ÷ 914 = 295 psi / 100 stks


Pressure Decreasing in Casing (psi/required stks) = (Maximum Initial End of Tubing Pressure (psi) – Maximum Final Pressure (psi)) X Required strokes (stks) ÷  Volume from End of Tubing to Top of Perforation (stk)

Pressure Decreasing in Casing (psi/required stks) = (2,304 – 2,176) X 100 ÷ 186 = 96psi / 100 stks


Draw the bullhead chart based on this data

The red line is the maximum pressure. If pressure exceeds the red line, a formation will be broken down (fracture zone). The blue line represents a shut in condition. Pressure below the blue line means that the well is in an underbalanced condition (flow zone). The area between the red line and blue line is the safe zone for bullheading operation (Figure 3).


                                      Figure 3 – Bullheading Chart



For safe operation, pumping pressure must be within the bullheading zone (Figure 4).



                                        Figure 4 – Safe Bullheading



The formations may be fractured if pumping pressure exceeds the fracture line (Figure 5).



                       Figure 5 -Bullheading Operation Exceeding Fracture Pressure



Note: this chart is constructed without accounting for friction pressure. It is the most conservative pressure to prevent fracturing formation.

2 Commentaires

If I need to perform a Bullheading with diesel for a dead well (let's say because of high water cut or heavy liquid column inside the well that preventing it from reaching the surface), how would the calculation process go?
Do I need first to calculate the formation pressure and then calculate the hydrostatic pressure (liquid column inside the well) while it's dead and then calculate the amount of diesel to be injected inside the well. how can I make this calculation and then figure out from the results if the well is going to produce again or not.

July 24, 2018 at 2:04 PM  

Casino Online Gambling: How to Win Money in USA
Online 사천 출장안마 casino games are legal in several forms and are available to players in states 아산 출장마사지 that 양주 출장안마 currently 사천 출장샵 offer 김포 출장안마 them. In addition, online gambling

March 3, 2022 at 4:25 PM  

 
Copyright 2017 Petrolyte
Template par Emmanuel Awona