Bullheading Calculation Example
Bullheading
is one of the well control methods that involve pumping formation fluids back
into formation into a shut-in well.
Components of Pumping Pressure
For the bullheading operation, pumping pressure on surface is equal to summation of all frictional pressure and formation pressure minus hydrostatic pressure (Figure 1). The equation below shows this relationship in a mathematical term.Pump Pressure = Friction Pressure of Surface Lines + Friction Pressure of Tubing + Friction Pressure Across Perforations + Formation Pressure – Hydrostatic Pressure of Tubing
The pump pressure concept will be utilized for the bull heading calculation.
Figure 1 – Pump Pressure Components
The well information is given below;
Production casing was set at 12,000’MD/12,000’TVD.
Bottom of perforation is at 11,500’MD/11,500’TVD.
Bottom of perforation is at 11,000’MD/11,000’TVD.
End of production tubing is at 11,500’MD/11,500’TVD.
Production packer is at 10,300’MD/10,300’TVD.
Formation fracture gradient is 0.645 psi/ft
Formation pressure gradient is 0.445 psi/ft
Shut in tubing pressure = 2,800 psi
Production casing: 7” OD, 29 ppf, L-80, capacity factor = 0.0371 bbl/ft
Production tubing: 3.5” OD, 9.2ppf, L-80, capacity factor = 0.0087 bbl/ft
Pump output (bbl/stk) = 0.1 bbl/stk
Figure 2 describes the wellbore diagram based on the given information.
Figure 2 – Diagram of the well
Calculations
For the bull heading calculation, reference points for calculation formation pressure, fracture pressure, kill weight mud are based on top of perforation because it gives the most conservative fracture pressure value.Formation Pressure (psi) = Pressure Gradient (psi/ft) x Top of Perforation TVD (ft)
Formation Pressure (psi) = 0.445 x 11,000 = 4,895 psiFracture Pressure (psi) = Fracture Gradient (psi/ft) x Top of Perforation TVD (ft)
Fracture Pressure (psi) = 0.645 x 11,000 = 7,095 psiInitial Hydrostatic Pressure (psi) = Formation Pressure (psi) – Shut In Tubing Head Pressure (psi)
Initial Hydrostatic Pressure (psi) = 4,895 – 2,800 = 2,095 psiInitial Average Fluid Density (ppg) = Initial Hydrostatic Pressure (psi) ÷ (0.052 x Top of Perforation TVD (ft))
Initial Average Fluid Density (ppg) = 2,095 ÷ (0.052 x 11,000) = 3.66 ppgKill Weight Mud (ppg) = Initial Average Fluid Density + (Shut In Tubing Pressure (psi) ÷ 0.052 ÷ Top of Perforation TVD (ft))
Kill Weight Mud (ppg) = 3.66 + (2800÷ 0.052 ÷11,000) = 8.6 ppgMaximum Initial Surface Pressure (psi) = Formation Fracture Pressure (psi) –Initial Hydrostatic Pressure (psi)
Maximum Initial Surface Pressure (psi) = 7,095 – 2,095 = 5,000 psiThe below calculation relates to pressure while bullheading.
Maximum End of Tubing Pressure (psi) = Fracture Pressure (psi) – (Kill Weight Mud (ppg) x 0.052 x End of Tubing TVD (ft)) – Initial Average Fluid Density (ppg) x 0.052 x (Top of Perforation TVD (ft) – End of Tubing TVD (ft))
Maximum End of Tubing Pressure (psi) = 7,095 – (8.6 x 0.052 x 10,500) – (3.66 x 0.052 x (11,000 – 10,500)) = 2,304 psiMaximum pressure when Kill Mud Weight reaches perforation
@ Top of Perforation (11,000 ft TVD)Maximum Final Pressure (psi) = Formation Fracture Pressure @ top of perforation (psi) – (Kill Weight Mud (ppg) x 0.052 x Top of Perforation TVD (ft))
Maximum Final Pressure (psi) = 0.645 x 11,000 – (8.6 x 0.052 x 11,000)Maximum Final Pressure (psi) = 2,176 psi
@ Bottom of Perforation (11,500 ft TVD)
Maximum Final Pressure (psi) = Formation Fracture Pressure @ bottom of perforation (psi) – (Kill Weight Mud (ppg) x 0.052 x Bottom of Perforation TVD (ft))
Maximum Final Pressure (psi) = 0.645 x 11,500 – (8.6 x 0.052 x 11,500)Maximum Final Pressure (psi) = 2,275 psi
The most conservative figure for the maximum final pressure is 2,176 psi.
As you can see, the figure reference to the top of perforation gives the most conservative figure. This is the reason why top of perforation is selected for the calculation.
Volume Pumped in Tubing (bbl) = Tubing Capacity Factor (bbl/ft) x Length of Tubing (ft)
Volume Pumped in Tubing (bbl) = 0.0087 x 10,500 = 91.4 bblStroke Pumped in Tubing (stk) = Volume Pumped in Tubing (bbl) ÷ Pump Output (bbl/strk)
Volume Pumped in Tubing (stk) = 91.4 ÷ 0.1 = 914 strokesVolume Pumped From End of Tubing to Top of Perforation (bbl) = Casing Capacity Factor (bbl/ft) x (Top of Perforation TVD (ft) –End of Tubing TVD (ft))
Volume Pumped in Tubing (bbl) = 0.0317 x (11,000 – 10,500) = 18.6 bblStroke Pumped From End of Tubing to Top of Perforation (stk) = Volume Pumped in Casing (bbl) ÷ Pump Output (bbl/strk)
Volume Pumped in Tubing (stk) = 18.6 ÷ 0.1 = 186 strokesVolume Pumped From Top of Perforation to End of Perforation (bbl) = Casing Capacity Factor (bbl/ft) x (End of Perforation TVD (ft) – Top of Perforation TVD (ft))
Volume Pumped in Tubing (bbl) = 0.0317 x (11,500 – 11,000) = 18.6 bblStroke Pumped From Top of Perforation to End of Perforation (bbl)) = Volume Pumped in Casing (bbl) ÷ Pump Output (bbl/strk)
Volume Pumped in Tubing (stk) = 18.6 ÷ 0.1 = 186 strokesTotal Volume Pumped Summary
Pressure Schedule While Bull Heading
This is the same concept as pressure schedule in wait and weight well control method.Pressure Decreasing in Tubing (psi/required stks) = (Maximum Initial Surface Pressure (psi) – Maximum End of Tubing Pressure (psi)) X Required strokes (stks) ÷ Tubing volume (stk)
For this calculation, 100-strokes is selected.Pressure Decreasing in Tubing (psi/required stks) = (5,000 – 2,304) x 100 ÷ 914 = 295 psi / 100 stks
Pressure Decreasing in Casing (psi/required stks) = (Maximum Initial End of Tubing Pressure (psi) – Maximum Final Pressure (psi)) X Required strokes (stks) ÷ Volume from End of Tubing to Top of Perforation (stk)
Pressure Decreasing in Casing (psi/required stks) = (2,304 – 2,176) X 100 ÷ 186 = 96psi / 100 stksDraw the bullhead chart based on this data
The red line is the maximum pressure. If pressure exceeds the red line, a formation will be broken down (fracture zone). The blue line represents a shut in condition. Pressure below the blue line means that the well is in an underbalanced condition (flow zone). The area between the red line and blue line is the safe zone for bullheading operation (Figure 3).
Figure 3 – Bullheading Chart
For safe
operation, pumping pressure must be within the bullheading zone (Figure 4).
Figure 4 – Safe Bullheading
The
formations may be fractured if pumping pressure exceeds the fracture line
(Figure 5).
Figure 5 -Bullheading Operation Exceeding Fracture Pressure
Note: this chart is constructed without
accounting for friction pressure. It is the most conservative pressure to
prevent fracturing formation.
2 Commentaires
If I need to perform a Bullheading with diesel for a dead well (let's say because of high water cut or heavy liquid column inside the well that preventing it from reaching the surface), how would the calculation process go?
Do I need first to calculate the formation pressure and then calculate the hydrostatic pressure (liquid column inside the well) while it's dead and then calculate the amount of diesel to be injected inside the well. how can I make this calculation and then figure out from the results if the well is going to produce again or not.
Casino Online Gambling: How to Win Money in USA
Online 사천 출장안마 casino games are legal in several forms and are available to players in states 아산 출장마사지 that 양주 출장안마 currently 사천 출장샵 offer 김포 출장안마 them. In addition, online gambling